Reading Challenges
Canadian Books #5
July - June 2012

MT TBR Challenge
Jan - Dec 2012

Graphic Novel Challenge
Jan - Dec 2012







Comments for Plumbing and Electrical

Plumbing: 8/2/04

Save for three tiles and the painting, our upstairs bathroom is done. It took our entire weekend with Ian "helping" the contractor our neighbor recommended. We'll be having him back to do the kitchen and perhaps later the downstairs bathroom. We didn't get to use the fish tiles but that's okay. We're going to make coasters out of them.

Electrical:


Besides doing the bathroom, he also managed to tear down the remaining boards of the old built in to open up the hallway. He moved the wall switch back to where it belongs, turned the scary pigtailed wires back into a wall socket and fixed the chandelier. The chandelier had been shorted out by the pigtailing.

Comments (0)

Permalink


Name:
Email (won't be posted):
Blog URL:
Comment: